Specification Center > Builder Resource Center

Contact Support: (888) 453-8358

Where to Buy

For pricing, quotes, or availability of products use our Where to Buy tool to find a Dealer near you.

Where to Buy

Northwest Territory Map

Northwest Trus Joist Territory Managers

Nolan St Martin

Nolan St Martin

(253) 471-5103
Email

Keith Cuthbert


Email

Mike Bagley


Email

Sky Eckert

(208) 869-1045
Email

Tony Gunn

Tony Gunn

(281) 682-6580
Email


Past Webinar Recordings

 

Trus Joist Products

VISUAL RESOURCES

Trus Joist Floor Installation Detail Guide


Additional information available at wy.com/besafe and in our TJ Installation Guide TJ-9001.

Video Detail References

Click the detail number to show a brief video.

a1-hex-detail.gif a2-hex-detail.gif
b1-hex-detail.gif b2-hex-detail.gif
cs-hex-detail.gif e1-hex-detail.gif
e2-hex-detail.gif e4-hex-detail.gif
h1-hex-detail.gif h3-hex-detail.gif
h2-hex-detail.gif
Single
h2-hex-detail.gif
Multi
la-hex-detail.gif l6-hex-detail.gif
Subfloor Installation Video

Featured Videos

View the full video play list by clicking the list icon at the top right of the video.


Trus Joist EWP Literature

By application

VISUAL LITERATURE GUIDE

Click the image below to launch an interactive PDF to navigate technical literature by application and product.

Visual Literature Guide

Featured Trus Joist Tech-Bulletin

Featured Northwest Informer/Detail

Additional Literature Resources - Informers, Details, Stocking Lists

Informers

Title Size Description
NW-N101 Parallam and 24F-V4 GLB.pdf 835.43 KB Updated Jan. 2023
NW-N102 Large Holes TJI.pdf 753.44 KB Updated Jan. 2023
NW-N105 Allowable Bearing Stress.pdf 663.80 KB Updated Jan. 2023
NW-N107 TJI Blocking Requirement at Bearing.pdf 630.00 KB Updated Jan. 2023
NW-N111 Mid Span Bridging.pdf 651.00 KB Updated Jan. 2023
NW-N113 Prescriptive Rim Checklist.pdf 601.00 KB Updated Jan. 2023
NW-N122 Blocking at Wall Inside Stem Wall.pdf 570.63 KB Updated Jan. 2023
NW-N123 Web Stiffeners at End Supports.pdf 833.49 KB Updated Jan. 2023
NW-N126 Slope for Flat TJI Roof.pdf 703.98 KB Updated Jan. 2023
NW-N127 TJI Purlin (rotated) Example.pdf 1,059.47 KB Updated Jan. 2023
SW-N132 Shear Wall Sole Plate Fastening Recommendations.pdf 615.34 KB Updated Jan. 2024
SW-N137 2.2E PSL & V4-V8 GLB Comparison.pdf 234.35 KB Updated September 2024
SW-N138 Shear Wall Values.pdf 495.98 KB Updated Feb. 2024
TB-715 Treated Sill Plate With Hangered TJI.pdf 201.35 KB Updated Jan. 2023

Details

Title Size Description
NW-D201 Cant TJI Supporting Deck Framing.pdf 266.36 KB Updated Nov. 2024
NW-D206 Support For Log Wall.pdf 204.37 KB Updated Nov. 2024
NW-D207 LSL Ledger On Concrete.pdf 171.08 KB Updated Nov. 2024
NW-D208 LSL on Concrete Corbel.pdf 182.11 KB Updated Nov. 2024
NW-D212 Post Repair Detail.pdf 234.98 KB Updated Nov. 2024
NW-D213 Hanging Soffit From TJI.pdf 176.45 KB Updated Nov. 2024
NW-D217 Roof Joist Uplift Connection.pdf 328.50 KB Updated Jan. 2023
NW-D218 Joist Support By Concrete Corbel.pdf 169.36 KB Updated Jan. 2023
NW-D219 Uplift Relief Cut.pdf 141.62 KB Updated Jan. 2023
NW-D222 Crawl Space Access Detail.pdf 192.81 KB Updated Jan. 2023
NW-D223 Plumbing Drop Detail.pdf 154.73 KB Updated Jan. 2023
NW-D224 TJI Joist Electrical Hole Field Guide.pdf 169.90 KB Updated Jan. 2023

Stocking Lists

Title Size Description
Billings, MT Stocking List.pdf 246.46 KB Updated Nov. 2021
Boise, ID Stocking List.pdf 220.58 KB Updated Jun. 2020
Butte, MT Stocking List.pdf 237.30 KB Updated Nov. 2021
SLC, UT Stocking List.pdf 225.51 KB Updated Jun. 2020
Spokane Valley, WA Stocking List.pdf 246.69 KB Updated Nov. 2021
Tacoma, WA and Albany, OR Stocking List.pdf 229.21 KB Updated Dec. 2023

 

For documents or information not found above, please contact your Trus Joist Territory Manager shown above for assistance.