South Central Trus Joist Territory Managers
Technical Assistant
Judy Andrade
(310) 918-7759
Email
Events
Trus Joist EWP Literature
If you'd like hard copy binders of literature contact the rep in your area using the contact info above.
Most Viewed Technical Bulletins
- TB-609: Eastern Parallam® PSL Frequently Asked Questions
- TB-818: TJI® Joists with a Side Flange Notch in the Top (Compression) Flange
- TB-808: Bottom Flange Trus Joist® TJI® Joist Attachment Connections
- TB-319: Weyerhaeuser Engineered Wood Products Header-Off Span Table
- TB-817: Trus Joist® TJI® Joist Repair Details for Holes Located Within 12" of End Bearing
- TB-500: 20", 22", and 24" Deep Depth Beam Design Guide for 2.0E Microllam® LVL
- TB-305: Re-Sawing Microllam® LVL, Parallam® PSL, and TimberStrand® LSL
- TB-824: Trus Joist® TJI® Ceiling Joist Span Tables
- TB-112: Moisture Effects on Weyerhaeuser Engineered Wood Products and Oriented Strand Board
- TB-206: Fastener Spacing in Weyerhaeuser Engineered Lumber Products
- TB-310: Use of Topical Coatings with Weyerhaeuser Engineered Wood Products
- TB-816: Weyerhaeuser Engineered Wood Products Header-Off Span Table
- TB-805: TJI Joists in Rafter Cut Applications
VISUAL LITERATURE GUIDE
Click the image below to launch an interactive PDF to navigate technical literature by application and product.
South Central Distribution